DSCN3368
previous arrow
next arrow
DSCN3368
DSCN3376
right oblique detail
DSCN2994
P1010233
previous arrow
next arrow

Choate Rosemary Hall

Wallingford, CT

Overview

EDM has completed several projects at Choate Rosemary Hall including:

St. John Hall – The design for complete renovation of the school’s existing math and computer science building featured a new entrance with outdoor patio overlooking the campus, a student common area, and cafe. Planned modernizations to the building included new finishes, lighting, mechanical, electrical, and plumbing upgrades, and replacement of exterior windows. EDM designed and engineered the project to meet LEED Silver Certification, while blending in with the historic campus.

Hill House Portico and Stairs – Severe deterioration at the front entrances of three historic campus buildings lead to their need for replacement. EDM designed careful reconstructions, paying tribute to the original historic designs, while incorporating needed design improvements such as reconfigurations enhancing a sense of welcome. accessibility improvements, LED lighting, reconstruction of wood columns, trim and balustrades.

Headmaster’s House – 11,000 SF residential design for Choate Rosemary Hall’s school headmaster and family.

Services Provided

  • Code Consulting
  • Mechanical Engineering
  • Electrical Engineering
  • Plumbing Engineering
  • Structural Engineering